Back to results
Road Infrastructure Costs: Analysis of Unit Cost and Cost Overruns of Road Infrastructure Projects in Africa
- Author
- African Development Bank Statistics Department (ESTA)
- Description
This is a report of the study on "Road Infrastructure Costs: Analysis of Unit Cost and Cost Overruns of Road Infrastructure Projects in Africa". The study was undertaken within the context of the African Development Bank’s Africa Infrastructure Knowledge Program. The report presents findings of the analysis on unit costs and cost overruns of road infrastructure projects in Africa.
- Publication date
- 2014
- Document type
- Report
- Language(s)
- English
- Download
- AfDB_Brief_Road_Costs.pdf (3.83 MB)
Categories: Transport, Infrastructure Financing